Architect :

Eric Parry Architects

Construction Manager :

Sir Robert McAlpine

Project Value : £1.7m
   
Scope of Works

Installation of the Bespoke WC Package

   
Project Summary :

Design and install the complete cubical system using 54mm thick cubical dividers and 44mm thick veneered doors and pilasters. The doors to have a lift off overhead panel with a linear grille bulkhead detail above. The cores include bespoke stone vanity worktops, bespoke translucent corrain light fittings, corrian push plates to the doors and a host of back painted glass. A fully accessible IPS panel system with horizontal and vertical shadowgaps. Domus anti-slip 600x600mmm sq floor tiles and 600x100mm skirting tiles. We are designing bespoke mirror units which are to include a identification hole behind the film to allow visible stock off the paper towels located in the Dolphin accessory behind.