Architect :

BNP Paribas Real Estate

Construction Manager :

ISG

Project Value : £110,000
   
Scope of Works

Level 5 Strip Out.

   
Project Summary :

Works carried out to level 5 only included a full strip out of the existing ceiling and reinstall a new SAS 750x750mm metal ceiling system. Design features include a perimeter bulkhead, linear grilles and feature lift lobby ceilings.