Architect :

Fletcher Priest

Construction Manager :

COMO

Project Value : £1.8m
   
Scope of Works

24 levels of CAT A fit out

SAS System 330 ceiling system with plasterboard margins

A central core service trough integrated within the ceiling module.

Install Anodised column casings to internal walls.

   
Project Summary :

Levels 2-3-4-5-6. (podium) SAS System 330 (1454x300) installed on a 40mm profile with integrated light/grille tiles. Plasterboard to all perimeter’s.

Levels 7-24. (tower) SAS System 330 (954x300) installed on a 40mm profile .plasterboard Margins to external perimeter & core walls.

Integrated service trough within the ceiling at 2100mm running continually round building cutting across plasterboard segments with a purpose 930 radius curve section. All light & grilles integrated within tile apertures.

Install GRG round columns to all exposed steel columns, all plasterboard finished with a taped & jointed finish