Architect :

Harmsen

Construction Manager :

Overbury

Project Value : £290,000
   
Scope of Works

Level 1, 2,6 & Basement

1. Ecophon Lp Acoustic System ceiling
2. Partitioning
3. MF Ceilings
4. SAS 150 ceilings
5. SAS System Partitioning
6. SAS doors

   
Project Summary : This project was very detailed so we needed to produce many drawings working well with Harmsen to create their Design Intent.
Although this was a CAT A project it had a CAT B feel to the level of detail in which we had to hand over the job.
We installed both SAS SG8000 and DG8000 systems around the Atrium and created offices / meeting rooms.