Architect :

Gensler

Construction Manager :

ISG

Project Value : £700k
   
Scope of Works

Installation of new suspended ceilings to all levels of the building inclusive of 2 Executive Floors.

Comprising of British Gypsum Casoline MF plasterboard ceilings and perimeter margins

SAS System 200 (Bespoke) SAS System 330 (tartan/linear band raster) and System 150 AB (Hygienic clip-in swing down)

   
Project Summary : Standard Bank was 4 floors of fit out Ground through the Level 3, Ceiling ranged from a 330, 320, 130, 150 -  Co-ordination was the key to the successful delivery of this Project ( as there was plenty of solid plasterboard areas with many services running through ), we worked well with Gensler and produced a string of working drawings and offered some different design ideas that worked well – we used a SAS bespoked ceiling which was designed and delivered and installed on time.