Architect :

Allford Hall Monaghan Morris

Construction Manager :

MACE

Project Value : £1.2m
   
Scope of Works

CEILINGS -  Installation of SAS System 330 ceilings with a plasterboard Margin.  Multi-finish Plaster is to be applied to all ceilings
DRYWALL - Installation of many specific drywall elements ranging from Gypwall Classic to Shaft wall.
Armourcoat is to be applied to the lift lobby ceilings on all floors.

   
Project Summary :

W4 is a CAT A fit-out. The install is being carried out from levels, Basement to level 6. The project commenced in January 2012 and is due to be completed October 2013.

The Area of the W4 Building is 200,000 ft² (approx.) or 17,000 m² (approx.) Office and Retail Space